Our Products
Our Products
Our Products
Our Products
Products
Innovative Solutions for Semiconductor Manufacturing. Optimizing production, connecting technologies, shaping the future.
Made by engineers for engineers
View more
Basebuilder
Our design automation tool is built for Semiconductor Owners and Contractors in the Basebuild phase
Design Automation
Design Automation
Design Automation
Design Automation
Project Phases
Project Phases
Project Phases
Project Phases
AI Report 2025
AI Report 2025
AI Report 2025
AI Report 2025
Case Studies
Case Studies
Case Studies
Case Studies
Our Story
Our Story
Our Story
Our Story
Blog
Blog
Blog
Blog
Jobs
Jobs
Jobs
Jobs
Get in Touch
Get in Touch
Optimize Every Phase of Your Project with Facility Connect
From preliminary design to commissioning, Facility Connect ensures seamless execution, reducing delays, cutting costs, and eliminating surprises.
Click on a project phase to discover the specific challenges you face and how our solution can help.
Explore Project Phases
Nav open
Nav close
01
Preliminary Design
02.
Detailed Design
03.
Construction
04.
Field Management & Commissioning
05.
Ongoing Operations
01
Preliminary Design
02.
Detailed Design
03.
Construction
04.
Field Management & Commissioning
05.
Ongoing Operations
01
Preliminary Design
This phase involves defining initial requirements and layouts for your facility, setting the foundation for all future work.
Incomplete or outdated tool and facility data leading to flawed designs
Lack of visibility into future manufacturing changes impacting layouts
Difficulty coordinating with multiple stakeholders early in the process
Our software
How Facility Connect Helps
Consolidates all facility and process data into a single, accurate source of truth
Provides dynamic tools to model the impact of future manufacturing changes
Simplifies collaboration with shared, real-time data access for all teams
Our software
Key Features
Centralized POC Management to visualise how tools connect to the facility
Single Source of Truth that keeps all stakeholders aligned with the latest data and design changes.
Smart Optimization Tools to quickly generate and test multiple layout options for the most efficient configurations.
02
Detailed Design
In this phase, detailed construction documents and system designs are developed, specifying every component of the project.
Gap analysis takes up to 13 weeks, delaying project timelines
Overlapping gap analysis waves create confusion and bottlenecks
Inability to accurately predict project budgets, leading to costly surprises
Our software
How Facility Connect Helps
Speeds up gap analysis, reducing the process from weeks to days
Eliminates overlap confusion by providing clear, sequential analysis
Delivers upfront budget predictability, avoiding unexpected cost overruns
Our software
Key Features
System Gap Analysis to see gaps between the facility and the equipment
Capacity versus demand planning to identify potential system overloads
Coordinated Change Management to ensure everyone in the team knows which POCs are in use
03
Construction
This phase involves the building and installation of equipment, systems, and infrastructure.
Last-minute design changes cause costly rework and schedule delays
Misalignment between design intent and field execution
Surprise scope gaps identified too late in the process
Our software
How Facility Connect Helps
Provides real-time updates to ensure field teams have the latest designs
Validates tool-to-facility connections against design specifications
Identifies and addresses scope gaps early, minimizing rework
Our software
Key Features
Capacity vs Demand Visualization to monitor system loads in real-time and prevent overloads during installations.
POC Assignment Validation to confirm all tool-to-facility connections are correctly aligned with the design intent, reducing field errors.
Proactive Gap Detection to identify and resolve scope gaps before construction begins, minimizing costly rework.
04
Field Management & Commissioning
This phase focuses on finalizing installations, testing systems, and ensuring everything operates as intended.
Unexpected capacity overloads during commissioning
Slow approval processes delaying project handover
Inconsistent documentation leading to operational inefficiencies
Our software
How Facility Connect Helps
Tracks capacity in real-time to prevent overloads during system startup
Streamlines approval workflows to accelerate commissioning timelines
Centralizes all documentation for consistent, reliable access
Our software
Key Features
Approval Workflow Management to streamline POC sign-offs, ensuring fast, transparent approval processes during commissioning.
Connection Validation Tools to verify that all tool connections meet design and safety standards before final handover.
Capacity Monitoring and Projections to foresee potential system overloads and adjust configurations before issues arise.
05
Ongoing Operations
After commissioning, facilities enter ongoing operations, requiring continual monitoring and updates for new tools or process changes.
Frequent manufacturing process changes require rapid facility adjustments
Difficulty tracking tool installations and connections over time
Risk of capacity constraints as new tools are added
Our software
How Facility Connect Helps
Provides a single source of truth for all facility and tool data
Enables quick reconfiguration of tool connections to accommodate changes
Monitors capacity in real-time, ensuring proactive management of resources
Our software
Key Features
Continuous Monitoring to track system performance and capacity usage, ensuring proactive adjustments.
Centralized Data Repository to keep all tool and facility records up-to-date and easily accessible for quick decision-making.
Proactive Capacity Management to forecast future demands and prevent capacity bottlenecks as operations evolve.
contact
Speak to an
.
Engineer Today
First name
*
Last Name
*
Company
*
Business E-mail
*
Job title
*
Message
How did you hear about us?
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.